
1991
Establishing the Alteko company

1991
Starting the production of TERNOair conditioning units

1993
Purchasing the production site in Hostomice

1994
Starting the production of ALT 315 air conditioning units and RFcentrifugal fans

1996
Constructing the Warehouse I building

1997
Starting the production of RFClow-pressure centrifugal fans for PKJ 450 flat air conditioning units

1999
Starting the production of TERNO-S air conditioning units and starting the production of RFEmedium-pressure centrifugal fans

2000
Expanding the line RFC and RFE centrifugal fans by adding other sizes

2001
Starting the production of SAMBAflat air conditioning units and starting the production of RFC-PR fans with belt drive

2002
Introducing ISO 9001 quality management system

2005
Constructing a new operating and production hall

2005
Start the production of TANGOventilation units

2007
Acquiring the Designer (Projektant) design program

2008
Expanding the line of TANGOair conditioning units + expanding the line of RFCcentrifugal fans

2012
Starting the production of ALTER ventilation units

2014
Upgrading RFC fans by adding a new vertical rotation axis design (H and HL)

2016
Developing a new CMXcontrol system

2018
Expanding the line of TANGOair conditing units and expanding the line of TERNO-S air conditioning units

2019
Starting the production of ALTONventilation units
Download
Up-to-date technical documentation, previous versions of technical documentation, up-to-date installation instructions, catalogues and much more.